Q: Can you move my toilet?
A: Yes. It requires breaking the concrete slab (on the first floor) or re-framing the joists (on the second floor). It is a major job, but we do it routinely.
Q: Do you do the tile work too?
A: We specialize in the plumbing. We work alongside your tile setter or GC. By focusing on the pipes, we ensure the infrastructure is perfect.
Q: How long does the plumbing rough-in take?
A: For a standard bathroom, usually 1-2 days. For a complex master bath with slab excavation, 3-4 days.
Q: What brands of shower valves do you install?
A: We install Kohler, Delta, Moen, and Grohe thermostatic valves. We recommend pressure-balancing valves with separate temperature and volume controls for the best luxury shower experience.
Q: Do I need to upgrade my water heater for a luxury shower?
A: Often, yes. A rain head with multiple body sprays can demand 8-10 GPM of hot water. If you have a standard 40-gallon tank, it will run cold within 10 minutes. We recommend a tankless system for endless hot water during long showers.